Major works connected with the construction of heat systems and installations performed in the previous years.

Modernization of the heating system 2xDN250 within the logistic centre – “Prologis Park”, Kalinowa Street, Ruda Śląska which is in the operation of Dalkia PE S.A. system.

Customer: Prologis Poland Reit Sp. z o.o. i SKA in Warsaw — Realization: 10.2019 – 11.2019r.

 

Construction of pre-insulated heating system with a diameter of DN250 of approx. 200m along with the partial disassembly of the steel traditional pipeline and accompanying civil works.

 

Design and modernization of the heating system along with individual connections on the area of Na Równi Street in Nowy Targ.

Customer: MPEC Nowy Targ Sp. z o.o. — Realization: 01.2019 – 08.2019r.

 

— execution of the heating system technical design,
— construction of the pre-insulated heat system along with individual connections in the scope of diameters DN25-DN80 of approx. 670m.

 

Reconstruction of the heating system 2xDN350 in the frame of construction Retail Park Kasztelania in Chrzanów.

Customer: STEC Spółka Jawna in Chrzanów — Realization: 11.2018 – 06.2019r.

 

Construction of pre-insulated heating system in the scope of diameters DN200-DN350 of approx. 215m along with the partial disassembly of the existing pipeline and accompanying civil works.

 

Construction of the heating system and individual connections.

Customer: PEC Geotermia Podhalańska S.A. in Zakopane — Realization: 10.2018 – 10.2019r.

 

Construction of the heating system and individual connections in the scope of diameters DN25-DN100 of approx. 1275m.

 

Construction of the heating system and individual connections together with pumping stations in Zakopane.

Customer: PEC Geotermia Podhalańska S.A. in Zakopane — Realization: 06.2017 – 12.2019r.

 

— construction of the heating system at the housing estates on the area at Krzeptówki Street and Kościeliska Street,
— construction of a pumping station on the area at Gładkie Street,
— assembly of the pressure reduction system along with the replacement of pumps on the area at Szymoszkowa pumping station.

 

Pumping station at Górna Równia Krupowa in Zakopane.

Customer: PEC Geotermia Podhalańska S.A. in Zakopane — Realization: 08.2017 – 10.2019r.

 

— execution of complete technical documentation together with the all required law agreements,
— construction and assembly works based on the prepared technical documentation.

Exchange of pre-insulated elbows in an underground pre-insulated thermal water discharge pipeline 1xNFB11:1xDN300 in Szaflary and Biały Dunajec.

Customer: PEC Geotermia Podhalańska S.A. in Zakopane — Realization: 06.2018 – 09.2018r.

 

— execution of the technical design concept and technical documentation together with cost estimates,
— realization of complete technological and assembly works based on the prepared technical documentation.

 

Construction of the heating system and individual connections.

Customer: PEC Geotermia Podhalańska S.A. in Zakopane — Realization: 03.2018 – 10.2018r.

 

Construction of the heating system and individual connections in the scope of diameters DN25-DN100 of approx. 1144m.

 

Modernization of geothermal pipelines in Zakopane.

Customer: PEC Geotermia Podhalańska S.A. in Zakopane — Realization: 03.2017 – 07.2018r.

 

Construction of pre-insulated heating system sections made of AISI 316 acid-resistant steel in the scope of diameters DN200-DN300 of approx. 439m.

Construction of the heating system in Zakopane.

Customer: PEC Geotermia Podhalańska S.A. in Zakopane — Realization: 11.2016 – 12.2017r.

 

Construction of the heating system with a diameter of DN200 of approx. 800m on the area of Powstańców Śląskich Street.

 

Construction of the individual connections together with delivery and installation of the heat substations at the Wysłouchów Street in Krakow.

Customer: MPEC Kraków S.A. in Krakow — Realization: 07.2017 – 08.2017r.

 

Construction of the individual heating connections in the scope of diameters DN65-DN400 of approx. 450m and assembly and commissioning of 3 dual-function heat substations.

 

Design works of the heating system in the area of town Zakopane.

Customer: PEC Geotermia Podhalańska S.A. in Zakopane — Realization: 05.2014 – 07.2017r.

 

Execution of complete technical documentation together with cost estimates and obtaining the building permit for the area of Szymoszkowa pumping station, Krzeptówki and Kościeliska housing estates as well as Powstańców Śląskich Street.

 

Construction of heating system along with the delivery of materials. Delivery and installation of the heat substations.

Customer: MPEC Kraków S.A. in Krakow — Realization: 09.2016 – 08.2017r.

 

Construction of the individual connections in the scope of diameters DN32-DN100 of approx. 1300m. Assembly and commissioning of 15 single and dual-function heat substations.

Reconstruction of the heating system and individual connections on the area of Pawłowice community, Stage 2.

Customer: PEC Jastrzębie S.A. in Jastrzębie — Realization: 07.2016 – 10.2016r.

 

Construction of the housing estates heating system along with individual connections in the scope of diameters DN25-DN200 of approx. 1300m.

 

Reconstruction of the heating system and individual connections within the Słowackiego, Pracy, Dworskiej, Ogrodowej, Lwowskiej, Klasztornej and Kasprowicza Street in Racibórz.

Customer: PEC Jastrzębie S.A. in Jastrzębie — Realization: 04.2016 – 08.2016r.

 

Realization of the housing estates heating system along with individual connections in the scope of diameters DN25-DN150 of approx. 1505m.

Reconstruction of heating system, exchange of insulations and reconstruction of main heat substation to individual units along with the construction of the heating system and individual connections on the area of Dąbrowa Górnicza and Sosnowiec.

Customer: Tauron Ciepło Sp. z o.o. in Katowice — Realization: 07.2015 – 10.2015r.

 

— reconstruction of main heat substation on the area of Jagiellońska Street in Sosnowiec to individual units,
— modernization of housing estates heating system along with individual connections in the scope of diameters DN25-DN125 of approx. 1600m.

 

Modernization of ZEC S.A. heating system in 5th Division “Wieczorek” in Katowice to limit power loss, Stage 2.

Customer: Zakłady Energetyki Cieplnej S.A. in Katowice — Realization: 01.2015 – 10.2015r.

 

Reconstruction of magistral heating system and individual connections in the scope of diameters DN100-DN500 approx. 3100m, including in the scope of DN350-DN500 of approx. 1800m.

 

Construction of individual heat connections for PEC Geotermia Podhalańska S.A. in Zakopane.

Customer: PEC Geotermia Podhalańska S.A. in Zakopane — Realization: 12.2014 – 11.2015r.

 

Construction of individual connections in the scope of diameters DN25-DN100 of approx. 600m.

Modernization of ZEC S.A. heating system in 5th Division “Wieczorek” in Katowice to limit power loss, Stage 1.

Customer: Zakłady Energetyki Cieplnej S.A. in Katowice — Realization: 10.2013 – 12.2014r.

 

Reconstruction of magistral heating system and individual connections in the scope of diameters DN50-DN500 approx. 4000m, including in the scope of DN400-DN500 of approx. 3000m.

 

Repair of a complex of geothermal water collectors DN500 in Geothermal Heating Plant in Bańska Niżna.

Customer: PEC Geotermia Podhalańska S.A. in Zakopane — Realization: 07.2013 – 07.2014r.

 

— disassembly of the existing and assembly of the new pipeline DN500 of approx. 140m,
— exchange of the complex of geothermal water collectors DN500 in the existing geothermal heat plant,
— performance of specialist welding works (stainless steel), casing joints and system monitoring in full range.

 

Construction of transfer heating pipeline between Bańska PGP-3 bore and Geothermal Heating Plant in Bańska Niżna.

Customer: PEC Geotermia Podhalańska S.A. in Zakopane — Realization: 07.2013 – 07.2014r.

 

— construction of pre-insulated transfer heating pipeline DN300 of approx. 160m,
— construction of steel pipelines, equipment and fittings for the nominal pressure of 40 bars without execution of the control chamber and its equipment,
— performance of additional fittings by the head of BAŃSKA PGP-1 bore to the nominal pressure of 40 bars.